In Siasun Phase II huge Production Center, at the busy scene of rail transit manufacture workshop, Automatic Fare Collection (AFC) end equipments for Shenyang Metro line 1 are intensively manufactured. Automatic Selling Machines, Automatic Checking Machines and Semi-automatic Selling Machines during debugging or debugged finished are ordered arranged. Capable & experienced Technician and production worker accelerate the production schedule in order to insure the first batch of end-equipments get off produce line smoothly on condition that ensuring products’ quality and safety, with sacrificing their own time of enjoying holiday.
According to Shenyang Metro headquarters’ schedule requirement, Siasun should finish manufacture of all the Automatic Fare Collection (AFC) end-equipments for Line 1 with total number of 12 stations at west part, including list equipments of Automatic Gate (AG) for 144 channels, Ticket Vending Machine (TVM)*64 and Booking Office Machine (BOM) *51. To October 31, 2009, Siasun need to finish manufacturing of main AFC end-equipments of Line 1, including list equipments of AG for 399 channels, TVM*151 and BOM*99.
Now, the main end-equipments finished debugging has successful passed capabilities test, and their indicators have reached the industry leading level. Let’s expect to their shining show in the future of Shenyang Metro.
.jpg)
(Production Field)
.jpg)
(Automatic Ticket-Checking Machine)
.jpg)
(Automatic Ticket-Selling Machine)